Skip to content
Dec 18, 2025
  • Contoh Analisa Jembatan
  • Perhitungan Bollard Pull Tugboat (BV)
  • Lifting Engineer Data Center
  • Sistem Manajemen PERDIN
  • Survey dan Jalan Jalan
  • Road Simulation Heavy Cargo
  • Bearing Efektif Crane Mat
  • Ship to Barge Transfer
  • Hitung Timber Outrigger Pad
  • Transport dengan Blade Lifter
Header Image

ALVINBURHANI.NET

MUHAMMAD BURHANUDDIN BLOGSITE

Bigyapaan Image
  • Home
    • My Resume CV
    • My Certificates
    • PERDIN Program
    • Ship Track & Trace
    • Login
    • Privacy Policy
  • MY CALCULATOR
    • GBP Multi-Axle
    • Hitung GBP SPMT
    • Acceleration Force
    • Deacceleration Force
    • BP Tugboat Calculator
    • Required HP Trucks
    • Hitung COG
    • Hitung Tractive Efforts
    • Container Load
    • For Barge Lashing
    • Bollard Pull Tugboat
  • Downloads
    • Checkout Download
  • Quiz
  • Courses
    • Barge Transportation
    • Heavy Cargo Transport
    • Heavy Lifting
    • Project Cargo Transport
  • Table of Contents
    • Contains
    • Post Table

Category: TEKNIK

Kecepatan Akselerasi & Deselerasi
TEKNIK

Kecepatan Akselerasi & Deselerasi

Muh. Burhanuddin14-April-2019M | 09-Shaban-1440H29-February-2024M | 19-Shaban-1445H

Cabang mekanika yang membahas gerak benda disebut dengan kinematika. Gerak benda dibahas tanpa meperhatikan penyebabnya. Adapun cabang mekanika yang mempelajari…

Prosedur Rigging
TEKNIK

Prosedur Rigging

Alvin Burhani11-March-2019M | 04-Rajab-1440H11-March-2024M | 01-Ramadan-1445H

Rigging adalah proses pengangkatan benda menggunakan alat berat dengan melibatkan banyak tali seperti wire rope sling, webbing sling atau rantai.…

Manajemen Logistik
TEKNIK

Manajemen Logistik

Alvin Burhani15-January-2019M | 09-Jumada Al Oula-1440H15-February-2024M | 05-Shaban-1445H

Manajemen menurut Parker (dalam Stoner dan Freeman, 2000) adalah seni melaksanakan pekerjaan melalui orang-orang. Sedangkan logistik dapat difenisikan sebagai proses…

Posts pagination

Previous 1 2 3
Muhammad Burhanuddin

Muhammad Burhanuddin

Jakarta, Indonesia

Author of ALVINBURHANI.NET, a blogsite where he shares insights, calculations, and designs related to engineering projects. Including transport methods, conducting feasibility studies, lifting plan, and optimizing logistics operations for heavy and oversized cargo.

TEKNIK TRANSPORT

  • Manajemen Logistik
    By Alvin Burhani
    Manajemen menurut Parker (dalam Stoner dan Freeman, […]
  • Prosedur Rigging
    By Alvin Burhani
    Rigging adalah proses pengangkatan benda menggunakan […]
  • Kecepatan Akselerasi & Deselerasi
    By Muh. Burhanuddin
    Cabang mekanika yang membahas gerak benda disebut […]
  • Pentingnya CoG di Heavy Cargo
    By Muh. Burhanuddin
    Titik pusat massa cargo, kendaraan alat angkut, atau […]
  • Menghitung Gaya Gesek (Friksi)
    By Muh. Burhanuddin
    Gaya Gesek adalah gaya yang berlawanan arah dengan […]
  • Menghitung Ship Motions Accelerations
    By Muh. Burhanuddin
    “Ship motions” mengacu pada […]
  • Beban Bergerak (Moving Load)
    By Muh. Burhanuddin
    Beban bergerak adalah beban yang bergerak pada jarak […]
  • Bending Analysis Ramp Door
    By Alvin Burhani
    Bending Stress Analysis adalah proses yang digunakan […]
  • Analisa Jembatan Portable Bridge
    By Muh. Burhanuddin
    Portable bridge adalah sebuah jembatan yang dirancang […]
  • Temporary Support Transportasi Laut
    By Muh. Burhanuddin
    Dalam industri minyak dan gas, khususnya saat […]

Copyright © 2025 ALVINBURHANI.NET | Ace News by Ascendoor | Powered by WordPress.

  • Login
  • Sign Up
Forgot Password?
Lost your password? Please enter your username or email address. You will receive a link to create a new password via email.
body::-webkit-scrollbar { width: 7px; }body::-webkit-scrollbar-track { border-radius: 10px; background: #f0f0f0; }body::-webkit-scrollbar-thumb { border-radius: 50px; background: #dfdbdb }