Skip to content
Mon 22 Jumada Al Oula 1448AH 2-11-2026AD Jakarta • 31°C
Follow Us:
  • Facebook
  • X / Twitter
  • Instagram
  • YouTube
  • LinkedIn

ALVINBURHANI.NET

MUHAMMAD BURHANUDDIN BLOGSITE

  • Home
    • My Resume CV
    • My Certificates
    • PERDIN Program
    • Survey Report
    • Logistics Prices
    • Hutang Piutang
    • Login
    • My Account
    • Logout
    • Privacy Policy
  • MY CALCULATOR
    • GBP Multi-Axle
    • Hitung GBP SPMT
    • Acceleration Force
    • Deacceleration Force
    • BP Tugboat Calculator
    • Required HP Trucks
    • Hitung COG
    • Hitung Tractive Efforts
    • Container Load
    • For Barge Lashing
    • Bollard Pull Tugboat
    • LMT Production
  • Quiz
  • Courses
    • Barge Transportation
    • Heavy Cargo Transport
    • Heavy Lifting
    • Project Cargo Transport
  • Table of Contents
    • Contains
    • Post Table
  • Downloads
Perhitungan Bollard Pull (BP)
OFFSHORE

Perhitungan Bollard Pull (BP)

Sun 9 Muharram 1444AH 7-8-2022ADFri 7 Ramadan 1446AH 7-3-2025AD

Perhitungan Bollard Pull (BP) merupakan salah satu elemen penting dalam operasi towing maritim. Kegiatan towing melibatkan penarikan kapal, baik itu tongkang, vessel, atau struktur lepas pantai, menggunakan kapal lain yang biasanya berupa kapal tunda. Dari sudut pandang dasar, terdapat beberapa kesimpulan mengenai towing yang perlu dipahami: Ukuran Kapal: Kapal yang […]

TEKNIK TRANSPORT

  • Manajemen Logistik
    By Alvin Burhani
    Manajemen menurut Parker (dalam Stoner dan Freeman, […]
  • Prosedur Rigging
    By Alvin Burhani
    Rigging adalah proses pengangkatan benda menggunakan […]
  • Kecepatan Akselerasi & Deselerasi
    By Muh. Burhanuddin
    Cabang mekanika yang membahas gerak benda disebut […]
  • Pentingnya CoG di Heavy Cargo
    By Muh. Burhanuddin
    Titik pusat massa cargo, kendaraan alat angkut, atau […]
  • Menghitung Gaya Gesek (Friksi)
    By Muh. Burhanuddin
    Gaya Gesek adalah gaya yang berlawanan arah dengan […]

TOPIK PILIHAN

  • Bollard Pull Kapal Tug Boat
    By Muh. Burhanuddin
    Bollard pull adalah salah satu parameter penting yang […]
  • Revitalisasi Temporary Jetty
    By Muh. Burhanuddin
    Revitalisasi Temporary Jetty disini adalah dimaksudkan […]
  • Vessel Tracker: Aplikasi Penentuan Posisi Kapal Berbasis GPS Ponsel
    By Muh. Burhanuddin
    Operasi laut di proyek konstruksi dan pengerukan, […]
  • Daya Dukung Tanah
    By Alvin Burhani
    Daya dukung adalah kapasitas tanah untuk menahan beban […]
  • Transportasi Pipa dengan Tongkang
    By Muh. Burhanuddin
    Dalam dunia industri konstruksi dan manufaktur, […]

10,697 hits

TEKNIK TRANSPORT

  • Manajemen Logistik
    By Alvin Burhani
    Manajemen menurut Parker (dalam Stoner dan Freeman, […]
  • Prosedur Rigging
    By Alvin Burhani
    Rigging adalah proses pengangkatan benda menggunakan […]
  • Kecepatan Akselerasi & Deselerasi
    By Muh. Burhanuddin
    Cabang mekanika yang membahas gerak benda disebut […]
  • Pentingnya CoG di Heavy Cargo
    By Muh. Burhanuddin
    Titik pusat massa cargo, kendaraan alat angkut, atau […]
  • Menghitung Gaya Gesek (Friksi)
    By Muh. Burhanuddin
    Gaya Gesek adalah gaya yang berlawanan arah dengan […]

TOPIK PILIHAN

  • Towing Simulation
    By Muh. Burhanuddin
    Dalam operasi towing (penundaan) tongkang di industri […]
  • Ballasting Crane Barge
    By Muh. Burhanuddin
    Barge Ballasting adalah proses pengisian air ke dalam […]
  • Outrigger Pad Design <div class='awpa-single-post-star-variation' attributes='[{"ratings":{"id_49":5},"sum":5,"count":1,"avg":5,"people_count":{"count_5":1}}]' show_star_rating='1' rating_color_back='#EEEEEE' rating_color_front='#ffb900' rating_type='5' show_avg='', show_star_type='' show_votes='' star_size='x-small'></div>
    By Muh. Burhanuddin
    Crane merupakan alat yang sangat penting dalam […]
  • Perhitungan Trim, Heel, dan Stabilitas Awal
    By Alvin Burhani
    Dalam dunia perkapalan, memahami trim, heel (miring), […]
  • Loadout Menggunakan Skidding
    By Muh. Burhanuddin
    Loadout jacket dan topside deck menggunakan skidding […]

10,697 hits

August 2022
M T W T F S S
1234567
891011121314
15161718192021
22232425262728
293031  
« Jul   Sep »

Spam Blocked

1,587 spam blocked by Akismet (opens in a new tab)

About Muhammad Burhanuddin

Industrial Engineer, Specialist in Heavy Cargo Transportation and Heavy Lifting Works. Hobby in computer programming, reading and writing. No occupation except waiting for a prayer time. Ready for working as a surveyor, transport planer, or as lifting engineer.
https://www.alvinburhani.net

Tags

3 point suspension 4 point suspension barge ballasting bollard pull calculation daya dukung tanah GBP ground bearing pressure heavy cargo heavy cargo transport heavy lifting hitung beban outrigger Hitung Mooring Jacking jacking System jembatan heavy cargo killing space lashing pipe Lashing Securing LCT Ramp Door lifting plan logistics study Menghitung CoG Multi Axle Trailer outrigger calculation pipe transport PLTB portable bridge prosedur rigging ramp door analysis ramp door calculation rigging rigging plan RORO Ramp Skidding skidding loadout Skidding System Sliding Strandjack strand jack lifting swept path Temporary Jetty temporary support trailer stability turning locus turning simulation

Lifting at Data Center

https://www.alvinburhani.net/wp-content/uploads/2026/03/HGHLIGHT-LIFTING-PROJECT.mp4

Ship Stability

https://www.alvinburhani.net/wp-content/uploads/2026/03/video.mp4
Copyright © 2026. All rights reserved. Theme Rubik News by Kantipur Themes